Toronto Hydro's Conditions of Service and five reference documents are changing. The proposed implementation date is January 1, 2025. We've outlined the proposed changes in the following documents.
Proposed main document
Proposed reference documents
- Reference 4. Requirements for the Design and Construction of Customer-Owned High Voltage Substations (PDF, 3 MB)
- Reference 5a. Requirements for the Design and Construction of Customer-Owned Structures (PDF, 318 KB)
- Reference 5b. Construction Standards referenced in Requirements for the Design and Construction of Customer-Owned Structures (PDF, 32.7 MB)
- Reference 6. Metering Requirements 750 Volts or Less (PDF, 1.9 MB)
- Reference 8. Metering Services and Charges (PDF, 492 KB)
The proposed main document and proposed reference documents are currently in draft form. Customers can review the proposed changes and submit comments until December 20, 2024. Customers can submit comments using the contact information at the end of this page.