View or download our Conditions of Service
Conditions of Service - Main Document (PDF, 1.6 MB)
Additional documents
Revision summary
The Conditions of Service - Revision #23 Summary (PDF, 149 KB) highlights the latest revisions made to the Conditions of Service document.
Reference documents
The Conditions of Service reference documents provide further background information:
- Reference 1. Economic Evaluation Model for Distribution System Expansion (PDF, 104 KB)
- Reference 2. Standard Connection Agreements - Terms of Conditions (PDF, 70 KB)
- Reference 3. Distributed Energy Resource Requirements (PDF, 16.3 MB)
- Reference 4. Requirements for the Design and Construction of Customer-Owned High Voltage Substations (PDF, 2.9 MB)
- Reference 5a. Requirements for the Design and Construction of Customer-Owned Structures (PDF, 2.9 MB)
- Reference 5b. Construction Standards referenced in Requirements for the Design and Construction of Customer-Owned Structures (PDF, 6.6 MB)
- Reference 6. Metering Requirements 750 Volts or Less (PDF, 1.3 MB)
- Reference 7. Metering Requirements for 13.8kV and 27.6kV Customer-Owned Substations (PDF, 1,000 KB)
- Reference 8. Metering Services and Charges (PDF, 397 KB)
- Reference 9. Electric Vehicle Charging Connection Requirements for Toronto Hydro Customers (PDF, 147 KB)
Please note: Our Conditions of Service are subject to change. They are regulated by the Ontario Energy Board, and Toronto Hydro will submit any changes to the Ontario Energy Board.
Questions or comments?
Feedback regarding the latest revisions to our Conditions of Service can be emailed to conditionsofservice@torontohydro.com or mailed to:
Toronto HydroEngineering Policy
500 Commissioners Street
Toronto, ON
M4M 3N7